Laserfiche WebLink
• <br />a.ll(lo) <br />F <br />The plan shall include descriptions of the following: <br />(i) Final grading - specify maximum anticipated <br />slope gradient or expected ranges thereof; <br />(ii) Seeding - specify types, mixtures, quantities, <br />and expected time(s) of seeding and planting; <br />(iii) Fertilization - if applicable, specify types, <br />mixtures, quantities and time of application; <br />(iv) Revegetation -specify types of trees, shrubs, <br />etc. quantities, size and location; <br />(v) Tops oiling -specify anticipated minimum depth <br />or range of depths for those areas where topsoil will be <br />replaced. <br />(11) The terms of the governmental contract which make a <br />special permit necessary, and <br />117(1)(e) (12) Evidence of performance and financial warranties <br />provided under the governmental contract, if required. Surety <br />under this section shall not be required of units of county <br />government if the government entity submits a written <br />guarantee, in lieu of surety, stating that the affected lands <br />will be reclaimed in accordance with the terms of the permit <br />and section 34-32-115. <br />(13) Deleted. <br />(14) Deleted. <br />111{ 2) (c) , 4.~-Z`,~ ,. Fees-..,,P.~..~,.,~~,:~>~r,.,y <br />The fee shall be two hundred d~ rs plus fifteeri do]]~rs <br />per acre affected. <br />~- --- <br />1(7 4.13 In the case where <br />( an o erator, requires a p <br />m 2 ng cons ruction mater <br />a <br />s un er a c n rac with the State Department of Highways, <br />is ~tf1.,.gnvPrnmentaT subdivision shalt he exempted <br />e ee octal warranty requirements. In the <br />Lase where an operator requires a perms so e y~or the purpose <br />of mining construction materials to fulfill a contract with <br />the State Department of Highways, he shall be exempted fro <br />the requirements of paying a fee. <br />- 33- <br />