Laserfiche WebLink
sheet 1 of 2 <br />PROJECT IDENTIFICATION <br />Agency or orga <br />Task # : 07a <br />Date : 04/20/2006 <br />User : SSS <br />CIRCES Cost Estimating Software <br />TRUCK/LOADER TEAM WORK <br />tization name : DMG <br />State : Co/omdo PermiUjob # : M-2005-071 <br />County :Delta Abbreviation :none <br />Site :Benson Bros Red Shale Pit Filename :M071-07a <br />Permit or other job action :New 112c permit application <br />Total work team cosUhour <br />Task description :Haul subsoil from stockpiles to locations around processing area <br />HOURLY EQUIPMENT COST Shift basis : 1 per day <br />(Equipment Description <br />Truck loader team -Truck :Generic f0-12 cy, 6x4 <br />Support equipment -Load area : NI A <br />-Dump area : NA~ <br />Road maintenance -Motor grader : NA <br />-Water truck :Water Tanker. 3.500 Gal. <br />Cost Breakdown : TrucklLoader Work Team <br />Truck Loading Tool Support Equipment <br />Load Area Dump Area Road Maintenance Equipment <br />Motor Grader Water Truck <br />Import data flename: truck2 loader NA NA NA misctruk <br />%Utilization-machine: 100 89 NA NA NA 20 <br />-Ripper attachment: NA NA NA NA NA NA <br />Ownership cosUhour: $16.84 $18.57 NA NA NA $10.95 <br />Operating cosUhour: $25.86 $24.89 NA NA NA $4.12 <br />Ripper op. cosUhour : NA NA NA NA NA NA <br />Operator cosUhour : $21.75 $32.53 NA NA NA $21.16 <br />Unit subtotals : $64.45 $76.00 NA NA NA $36.23 <br />Number of units : 2 1 0 0 0 1 <br />Group subtotals : Work : $204.90 Support : $0.00 Maintenance : $36.23 <br />MATERIAL QUANTITIES <br />Initial Swell <br />volume: 3,226 LCY factor <br />$241.13 <br />Loose <br />NA volume: 3,226 LCY <br />Source of quantity take-off :Assume 3 acres covered with 8 inches ofoverburden <br />Source of estimated swell factor : NA <br />Material purchase cost : $0.00 /LCY Total cost : $0 <br /> <br />HOURLY PRODUCTION <br />Truck Cabacitv <br />Truck Payload (weight) Basis : Truck Bed (volume) Basis <br />Material weight : 2,550 poundslLCY Struck volume : 10.00 <br />Descr.:Earth -Dry packed Heaped volume : 12.00 <br />Rated payload : 35,400 pounds Average volume : 11.00 <br />Payload capacity : 13.88 LCY Adjusted volume': 12.00 <br />Final truck volume based on number of loader passes : 8.25 <br />'truck volume atljustetl to not exceetl ratetl payloatl or heapetl volume <br />Loading Tool Caoaciri : Job Conditior <br />Rated capacity (nom. heaped) : 3.750 LCY <br />Descr.:Other - rock/dirt mixtures (100-120%) Altitude adj. <br />Bucket fill factor : 1.100 Job effciency <br />Adjusted bucket capacity : 4-125 LCY Net correction <br />LCY <br />LCY <br />LCY <br />LCY <br />LCY <br />ectlons : Site altitude (ft.) : 6,340 <br />Truck Loader Source <br />1.000 1.000 (Cat HB <br />0.830 0.830 (1 shi(Uda: <br />0.830 0.830 <br /> <br />