My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE67355
DRMS
>
Back File Migration
>
Permit File
>
700000
>
PERMFILE67355
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:13:08 PM
Creation date
11/20/2007 9:49:16 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2005071
IBM Index Class Name
Permit File
Doc Date
4/20/2006
Doc Name
New 112c permit application bond calc
From
CIRCES Cos Estimate Software
To
File
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT IDENTIFICATION <br />Task # : O6a <br />Date : 04/20/2006 <br />User: SSS <br />Selected estimating method <br />Agency or organization name : DMG <br />Permit or other job action :New 112c permit application <br />Task description :Rip 3 acre processing area prior to replacement of overburden and topsoil <br /> <br />HOURLY EQUIPMENT COST <br /> Basic machine :Cat D7R DS Series 11 - 7SU Horsepower : 240 <br /> Blade type :Semi-Universal <br /> Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br /> Attachment no. 2 :3-shank ripper <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cost/hour : $43.17 NA <br /> Dozer operating cosUhour : $55.05 100 <br /> Ripper operatingcost/hour : $6.37 100 <br /> Operatorcost/hour : $32.53 NA <br /> Total unit cost/hour : $137.13 Total fleet wst/hour : $137.13 <br />MATERIAL QUANTITIES <br />Alternate methods - <br />Seismic : NA <br />Area : 3.00 <br />CIRCES Cost Estimating Software <br />BULLDOZER RIPPING WORK <br />State :Colorado <br />County :Delta <br />Site :Benson Bros Red Shale Pit <br />NA <br />acres <br />Load factor <br />Rip depth (ft) <br />Source of estimated quantity :Assume 3 acres <br />Source of estimated load factor : NA <br />HOURLY PRODUCTION <br />Alternate methods - <br />Seismic : Seismic velocity : NA feeUsecand <br />Unadjusted production : NA cu. yds./hour <br />Area : Avg. ripping depth : 2.00 feeUpass <br />Average ripping width : 6.50 feeUpass <br />Average ripping length : 100.00 feeUpass <br />Average dozer speed : 88.00 feeUminute <br />Average maneuver time : 0.25 minutes/pass <br />Production per unit area : 0.646 acres/hour <br />Unadjusted production : 2,083.79 cu. yds./hour <br />JOB TIME AND COST T <br />Fleet size : 1 dozers) <br />Unit cost : $0.079 per cu. yd. <br />NA Bank volume <br />2.00 Volume <br />=d to 2 foot depth <br />Area <br />NA BCY <br />9,680 BCY or CCY <br />~ Condition Correction Factors - <br />Unadjusted production <br />per selected method : 2,083.79 cu. yds./hour <br />Site altitude : 6,340 feet <br />Altitude adjustment : 1.00 (Cat HB) <br />Job efficiency factor : 0.83 (1 shiff/day) <br />Net job correction : 0.83 multiplier <br />Adjusted unit production : 1,729.54 cu. yds./hour <br />Adjusted fleet production : 1,729.54 cu. yds./hour <br />Total job time : 5.60 hours <br />Total job cost : $768 <br />PermiUjob # : M-2005-071 <br />Abbreviation :none <br />Filename : M071-06a <br />
The URL can be used to link to this page
Your browser does not support the video tag.