Laserfiche WebLink
CIRCES Cost Estimatlna Software <br />EQUIPMENT MOBILIZATION /DEMOBILIZATION <br />Agency or organ¢ation name' OMG <br />Task N: 005 State: Colorado Permi0job ll'M-2006098 <br />Date: 07/192002 County: ChaBee Abbredatlon'none <br />User: TOG Site: Monarch Duany Filename: M098-0OS <br />Permit or o[herjob action :New App. <br />Task description : m061/IZPldem06(IIZe <br />rRANSPORT RIG COST Shift basis : 1 per day <br />Cos[dab source: CRG Data <br />Truck tractor tlescription :Generic on-highway Nuck Natter, 6x4, diesel powered, 400 HP <br />Truck trailer tlescription :Generic loldinq Gooseneck. drop deck eauiomenf bailer 25T SOT and 90TI <br />Available rig capacitles: 0-25 Tons 26-50 Tons <br />Cost Breakdown : Ownership cosVhour $24.34 $2fi.89 <br />Operating cosVhour $28.49 $30.27 <br />Operator cosVhour $2707 $27.07 <br />Helper cast/houo $000 $23.]8 <br />Total Unit CosVhour $78.80 $10811 <br />NON-ROADABLE EQUIPMENT <br />Machine WeighVunit Ownership Haul Rig Fleet Size Haul Trip <br />Descrip8on (Tons) CosVhr/unit Costlhr/unit (No. units) CosUhrfllee[ 51«TOns <br />$33.09 <br />$34.34 <br />$270] <br />$23.78 <br />$11828 <br /> <br />Return Trip DOT permit <br />CosUhr/fleet CdsVllee[ <br />-Cat OfOR-10U 92.77 $7135 $118.28 1 $189.63 5118.28 $0.00 <br />dozerbletle 10.00 $10.00 $7990 1 $89.90 $79.90 $0.00 <br />-CAT 980G sfantlard liR 32.82 $33.32 $108.11 1 $141.43 $108.11 $0.00 <br />-Ca1768D 3].54 $50.87 $108.11 3 $4]6.94 $329.33 $0.00 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals: 3897.90 3630.64 50.00 <br />ROADABLE EQUIPMENT <br />Machine <br />Description Total <br />Costlhour/unit Fleet Size <br />INO. units) Haul Trip <br />CosUhrHleet Return Trip <br />CosVhrtlleet <br />-Fuel7anker 6x4, 210 HP $61.86 f $61.96 $61.96 <br />-Cube Truck, 6x4, 210 HP $76 f f 1 $7611 S76 f 1 <br />-Light Duty PmkuP, 4x4, 3/4 T $39.19 1 $34.14 $34.19 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals: $172.22 517242 <br /> Neares[major city or town within project area region: Salida <br />Transportation Cvde Time: Non- Total one-way travel distance: 15.0 miles <br /> Roadable Roadable Average travel speetl'. 30.0 mph <br /> Equipment Equipment <br />Haul Gme (hours) = 0.50 Q50 Total non-wadable mob/tlemob rosy: $3,324.31 <br />Retum time (hours)= 0.50 0.50 'M munE lops Mtn and dg <br />Loatling time (hours) = 0.50 NA Total roatlable mob/tlemob cost": $172.22 <br />Unloading Vme (hours) = 0.50 NA -one nme mp, no nod ng <br />Subtotals= 2.00 1.00 <br />:', <br />JOB TIME AND COST <br />Totaljob time: <br />4.00 <br />hours <br />~~ <br />Total job cost: $3,497 <br />