Laserfiche WebLink
CIRCES Cost Estimating Software <br />RE ~ ~~` <br />EIVEb s <br /> BULLDOZER WORK ' <br /> AU~ Q ~ <br />ZOO2 <br />PROJECT IDENTIFICATION Di <br /> vision of Minerals and Geology <br />Task # : 001 State :Colorado Permitfjob# : M-2000-098 <br />Date : 07/19/2002 County : Chaffee Abbreviation : none <br />User : TDG Site : Monarch Quarry Filename : M098-001 <br />Agency or organization name : DMG <br />Permit or other job action :permit consolidation <br />Task description : iegiade spoil pile <br />HOURLY EQUIPMENT COST <br />Basic machine :Cat D10R - l0U Horsepower : 570 <br />Blade type :Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2 : 3-shank ripper <br /> Utilization <br />Cost Breakdown : Ownership cosUhour : $71.35 NA <br /> Operating cost/hour : $112.82 100 <br /> Ripper op. cosUhour : $0.00 0 <br /> Operator cosUhour : $30.65 NA <br /> Total unit cosUhour : $214.81 Total fleet cosUhour <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume: 33,000 CCY factor : 1.215 volume: 40,095 <br />5214.81 <br />LCY <br />Source of estimated volume : provided by operator <br />Source of estimated swell factor : chb <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br />Average push distance : 300 feet <br />Unadjusted hourly production : 691.9 LCY/hr <br />Material consistency description <br />Compacted fill or embankment <br />Average push gradient : 10.00 <br />Average site altitude : 10,100 feet <br />Material weight : 3,300 Ibs/LCY <br />Weight description <br />Decomposed rock-75% Rock, 25% Earth <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) <br />Unit cost : $0.828 /LCY <br />Operator skill : 0.75 (avl <br />Material consistency : 0.90 (Cat <br />Dozing method : 1.00 (gee <br />Visibility : 1.00 (avl <br />Job efficiency: 0.83 (l shift. <br />Spoil pile: 0.80 (fnd <br />Push gradient: 1.22 (Cat <br />Altitude : 0.98 (Cat <br />Material weight : 0.70 (Cat <br />Blade type: 1.00 (S/Sl <br />Net correction : 0.38 <br />Adjusted unit production : 259.28 LCYlhr <br />Adjusted fleet production : 259.28 LCY/hr <br />Total job time : 154.64 Hours <br />Total job cost : $33,218 <br />Data source : (CRG) <br />