Laserfiche WebLink
about 55 feet in height. The hypotenuse of this triangle is 242 feet and the grade angle is <br />13 degrees. It is 450 feet across the face west to east. My calculations indicate there are <br />32,000 square yards to move to cut and fill the high wall and 13,000 yards of riprap for <br />the face. The disposal pit is 165 feet east to west and 65 feet north to south and will <br />require about 6 feet of fill or approximately 8,000 yards transported about 2000 feet over <br />good low grade roads to fill this pit. <br />The above measurements were made with a steel Brunton surveyors tape on a Brunton <br />survey line. Fairly accurate I hope. <br />The cost of removing the scale was calculated on trashing it and it's supporting structure <br />and placing it in the trash pit prior to covering it. <br />With Tom Gil]is's patients and expertise, we ran the above measurements and quantities <br />through the DMG's computerized program and came up with a total cost figure of <br />$87,116.00. I can visualize further minor tasks of policing and cleaning the trash from the <br />area which should not exceed $13,000. Therefore, I propose a reclamation bond at this <br />time of $100,000.00. <br />Enclosed are copies of the computer generated draft calculations of each task and the <br />summary. <br />If you are satisfied with the bond amount of $100,000 let me know and I'll have CLC <br />post the bond and this phase of the permitting will be finished. <br />Respectfully submitted, <br />co s Rant f CLC <br />cc: <br />J. Bowers <br />T. Smith <br />