Laserfiche WebLink
L-3E Permit A'l~ea E (cont'd) • <br />• <br />4. Po~aer transmission line removal - $1,000 <br />Total $7,000 <br />Cost per Acre $1,750 <br />L-3D Permit Area F <br />1. Grading and preparation of <br />existing prospect cuts and <br />trenches - $3,000 <br />2. Seeding and Fertilization @ $115 <br />per acre - 115 <br />3. Signs and Portal Barricade - $3,000 <br />Total - $6,115 <br />Cost Per Acre - $1,529 <br />L-4 Average Reclamation Cost <br />• $59,969 :- 29 = $2,068/acre <br />L-5 Phases of Reclamation <br />As previously discussed in Section E, overall reclamatio~m will <br />be accomplished during three distinct periods which are classified as <br />a) Ongoing;. b) Immediately After Disturbance; and c) Upon ABandon- <br />ment. Section D-6 illustrates planned disturbance and reclamation <br />through the year 2000. Should the life of the mine not reach or ex- <br />ceed the reclamation time schedule, then the schedule will move up or <br />back accordingly. <br />Ongoing reclamation will occur simultaneously with any disturbance <br />such as maintenance of underground pipelines and reseeding of areas <br />in which failures occur. <br /> <br />- 51 - <br />