Laserfiche WebLink
• <br /> <br />• <br />L-3 Permit Area A~cont'd) <br /> <br />4. Grading and bed preparation - <br />5. Planting and seeding of IVater Treatment <br />Plant area - <br />Total <br />Cost per Acre <br />L-3D Permit Area D <br />1. Topsoil removal, storage and replacer <br />ment, approximately 9000 BCY at $1.00 <br />per BCY (New Berm) - <br />2. Seeding Berm area @ $15 per acre - <br />3. Fertilization of Berm are @ $100 <br />per acre - <br />4. Mulching and bed preparation of <br />tailings @ $300 per acre - <br />5. Seeding Tailing area @ $45 per acre - <br />6. Fertilization of Tailings @ $400 <br />per acre - <br />7. Irrigation - <br />Total - <br />Cost per Acre <br />L-3E Permit Area E <br />1. Topsoil removal, storage, and <br />replacement, approximately 800 <br />BCY @ $1.00 per BCY <br />2. Seeding and Fertilization @ <br />$SO per acre <br />3. Equipme~it removal and concrete <br />bulkhead <br />500 <br />15 <br />$41,515 <br />$3,774 <br />$9,000 <br />90 <br />600 <br />1,500 <br />225 <br />2000 <br />500 <br />$13,915 <br />$1,390 <br />- $800 <br />- $200 <br />- $5,000 <br />'~~1 ~~! .~tl.! <br />- SO - <br />