i 1 <br />II <br />i <br />1 <br />contracts as the operator may win. Initial production may <br />start as early as late 1977, but most likely not until early <br />1978. <br />The total mining affected land may be subdivided as <br />follows: <br />Pit Area (including roads) 5.0 Acres <br />Topsoil Stockpile 1.0 Acre <br />Total Area 6.0 Acres <br />S-2 <br />