Laserfiche WebLink
The conversion plan described on the EPA Well Rework Record form and BLM <br />Sundry Notice for well 2A-2 V is to plug back from the mining zone to above the B- <br />Groove. The well will be perforated in the A-Groove and utilized as a second raw <br />water supply well. Due to limited availability of work over rigs, a second raw water <br />wells is essential. A pump will be installed in 2A-2V and the well will be operated <br />as a replacement well when 90-1 pump fails. The pump/motor generally last 2-3 <br />years and then the back up well will be utilized. A water well permit will be <br />obtained from the State Water Engineer prior to use, and a copy will be submitted to <br />the DMG. <br />Action on the five wells discussed above is planned in 2004 as soon as approval is <br />obtained. Remaining wells (old production/recovery wells) identified for plugging <br />and abandonment in the UIC Permit, will be addressed in 2005, within 18 months of <br />UIC Permit approval. <br />If there are any questions please contact Rod Storey, NSI Drilling Superintendent or <br />myself. <br />SincereGely, <br />~Z, <br />C~~~~ <br />Ed Baker, REM <br />EHS Manager <br />Cc: EPA <br />BLM <br />