Laserfiche WebLink
! • <br />EXHIBIT D - RECLAMATION PLAN <br />1. As previously stated, the mineral deposit to be mined outcrops Che surface <br />over the entire proposed site. Therefore, little if any topsoil or <br />overburden is available or evident. Because no topsoil or overburden is <br />available in sufficient quantities, none is anticipated to be utilized in <br />reclamation. Any waste rock or fines that is generated and not shipped by <br />operator to operator's Laporte sandplant will be utilized as backfill mate- <br />rial to reduce the slopes and highwalls. <br />2. As previously stated, a vertical working Face will be established on a <br />noL•th-south axis. Vertical sides of the quarry pit will be reduced to a 3:1 <br />slope by drilling and blasting and the use of heavy equipment. Final grad- <br />ing of a 3;1 slope is in accordance with the existing topography which can <br />be described as a steep hillside with a slope of approximately 3:1. It <br />is anticipated that the 3:1 slope is compatible with the configuration of <br />the surrounding topography and is compatible with its existing and an- <br />ticipated use as marginal rangeland. <br />3-7. Seeding of the reclaimed land will occur. Seeding will be broadcast by <br />hand. Operator will rely heavily upon the Soil Conservation Service for <br />recommended seed mixture, types, and quantities and revegetation. Hay <br />mulch at the rate of three tons per acre will be applied. Fertilization <br />will not be applied due to the lack of topsoil. Seeding will occur pri- <br />marily in the early spring. The kind of mulch and quantity of mulch co be <br />applied is as recommended by Soil Conservation Service, Operator believes <br />the mining site is not visible to vehicular traffic on any existing road. <br />The site is very isolated and inaccessible. <br />8. No ponds, streams, or buildings will remain after reclamation. The road to <br />be surveyed as an easement on Weaver Ranch, Inc., and the road on operator's <br />property as shoran on Exhibit E will remain for access by the operator. 7 <br />9. Waste material will not be generated and thus there will be no waste rock <br />dumps, tailing impoundments, underground mine openings, buildings or ocher <br />features remaining after reclamation. <br />4-1 <br />~~ <br />