My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE66959
DRMS
>
Back File Migration
>
Permit File
>
700000
>
PERMFILE66959
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:12:40 PM
Creation date
11/20/2007 9:37:11 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Permit File
Doc Date
5/15/2001
Doc Name
CDPHE CONSTRUCTION PERMIT (Air), Meteorology & Particulate Study
Section_Exhibit Name
EXHIBIT 08 PERMIT 95-MF-1040
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 8 <br />Colorado Department of Public Health and Environment <br />Construction Permit Air Pollution Control Division <br />COLOWYO COAL COMPANY, L.P. <br />Permit No. 95-MF-1040 <br />• Final Approval -Modification-4 <br />ATTACHMENT A [CONTINUATION - 1 ] <br />DETAILS OF EQUIPMENT / ACTMTIES COVERED UNDER THIS FACILITY-WIDE PERMIT <br />• <br />• <br /> DESCRIPTION REMARKS <br />AIRS ID MAKE, MODEL, S/N, DESIGN RATING, CAPACITY SPECIFIC PROVISIONS <br /> DIMENSIONS, CONSUMPTION, THROUGHPUT <br />023 Coal Preparation -Secondary Crusher House: Subject to NSPS, Subpar Y. <br /> Receipt of primary crushed coal: Compliance plan. <br /> One (l) Carmon, Model: 5536, and SJN: not available, feeder for <br /> feeding primary crushed coal to secondary crusher. Atomizing water spray nozzles at <br /> One (1) Kopper, Model: not available, and S/N: 180, hammer ring dump hopper and on the stacking <br /> type secondary crosher. tube. During freezing conditions, <br /> Conveyor system. use of sprays is not required. <br /> Stacking.tube. <br /> Storage system. Enclosure for conveyor and <br /> transfer points. <br /> Throughput: 9,000,000 tons per year. <br /> Baghouse. Control Efficiency for <br /> PM,°: Minimum 99.0 <br />024 Railcar Loading Terminal: Subject to NSPS, Y. <br /> Loading of railcars from storage piles by telescoping chutes. Compliance plan. <br /> Throughput: 9,000,000 tons per year. Atomizing water spray nozzles. <br />025 Storage Piles of ROM Coal /Crushed Coal /Reclamation: Subject to NSPS, Y. <br /> at Primary Crusher House Surface moisture. if inherent <br /> moisture is not sufficient, water <br /> at Secondary Crusher House sprays from mobile water truck <br /> will be used to control dust <br /> at Alternative Location. emissions. <br /> Front-end loader for reclamation. <br /> Conveyor system. <br /> Total storage piles azea: 37 acres. <br /> Throughput: 9,000,000 tons per yeaz. <br />081/0007/999 <br />
The URL can be used to link to this page
Your browser does not support the video tag.