Laserfiche WebLink
Page 7 <br />Colorado Deparhnent of Public Health and Envirotunent <br />Construction Permit Air Pollution Control Division <br />COLOWYO COAL COMPANY, L.P. <br />Permit No. 95-MF-1040 <br />• Final Approval -Modification-4 <br />022 ~ Coal Preparation -Primary Crusher House: <br />Receiving hopper, and Grizzly. <br />One (1) Stamler, ModeI:BF-I4D-G-]0, S/N: 11780, primary <br />crusher. <br />Covered belt conveyor system. <br />Coal storage bin with telescoping discharge chute for loading <br />of haul trucks. <br />Transfer to Secondary Crusher House. <br />Throughput: 9,000,000 tons per yeaz <br />Subject to NSPS, Subpart Y. <br />Compliance plan. <br />Partial enclosure to achieve 70.0 <br />control efficiency. <br />During May- October months, <br />atomizing nozzle water sprays, or <br />other devices of equivalent control as <br />determined by the Division, shall <br />also be used at grizzly and primary <br />crusher. <br />ATTACHMENT A CONTINUED .......... <br /> <br /> <br />081/0007/999 <br />