Laserfiche WebLink
<br />ROADABLE EQUIPMENT: <br />------------------ Total Eqp. Fleet Size Naul Trip Return Trip <br />Xachine Description Cost/hr (no. hauled) Cost/hr Cost/hr <br />Subtotals 50.00 SO 00 <br />MOB/DEMOB SUPPORT EQUIPMENT: --------- --_______ <br />sheet 2 of 2 <br />----------------------'---- Weight Oune rship Haul Rig Flee[ Size Xaul Trip Return Trip DOT Permit <br />Non-ROadable Eqp. Description (tons) Cost/hr Cos[/hr (no. hauled) Cost/hr Lost/hr Cost/ea <br /> _ ________________ <br />Subtotals ____________ <br />50.00 __________________________ <br />50.00 E0.00 <br /> <br />Total Eqp. <br />Fleet Size _________ <br />Haul Trip _________ _________ <br />Return Trip <br />Roadable Eqp. Description Cost/hr (no. hauled) Cost/hr Lost/hr <br />Fuel truck 848.80 1 548.80 848.80 <br />Lube truck 559.46 1 859.46 859.46 <br /> Subtotals 5108.26 5108.26 <br />EQUIPMENT HAUL DISTANCE 8 TIME <br />Nearest major city or town within project area region: San Luis <br />Total one way travel distance = 10.0 <br />______ mites . Average travel speed = 45.00 mph. <br /> <br />Job Time - Non Roadable Equip.= 0.50 <br />hours ___ <br />load Roadable Equip.= __________ <br />N/A <br />hours <br />load <br />0.22 hours haul 0.22 hours haul <br />0.50 hours unload N/A hours unload <br />0.22 hours return 0.22 hours return <br />JOB COST <br />Total Mob/Demob Cost = 5471.77 <br />NOTE: Non-roadable equipment (haul rig required [o transport) mob/demob costs based on 2 round trips, each [rip <br />consisting of a one-way loaded haul and a one-way empty return. Roadable equipment (no haul rig required) <br />costs based on one round trip. Colorado D07 requires special permits for oversize equipment on certain <br />specified road segments within the State. Separate permits are required for each rig on each loaded trip. <br />Addi ti onaf ly, pilot cars (one or two per rig depending on degree of oversize) are also required for oversize <br />equipment hauling, and loading/unloading times must be increased substantially for equipment which must be <br />partially dismantled for transport and re-assembled at the job site. Losts for lifting equipment and other <br />support equipment needed for this cork should be included in the mob/demob costs. <br /> <br />