Laserfiche WebLink
<br />Colorado Division of Minerals and Geology sheet 1 of 2 <br />ESTIMATING FORM - EOU IPMENT MOBIL12AilON / DEMOBILIZATION <br />Task 0... 4 Prep. by JCS Filename..M073 ~4 <br />____________ ________ ______ <br />Date..... 10-Nov-99 Permit q M-99-073 Mine......Pit 1 <br />____________ ________ ______ <br />Permit Action........ Estimate reclamation cost <br />__________________________________ <br />Task Description..... Mob/Demob <br />__________________________________ <br />HOURLY EQUIPMENT COST <br />NOTE - This is a list to select from, no[ a List of mandatory items [o include. <br />Mob/Demob Eqp. -Tractor 6x4, 75,000 lb GVW, 375 HP, diesel powered <br /> -Lt. Trailer 25 ton folding gooseneck, drop deck <br /> -Med. Trailer 50 Con folding gooseneck, drop deck <br /> -Hvy. Trailer 120 Tan folding gooseneck, drop deck <br /> -Pilot Car On~h ighway light duty truck, 4x2, 130 hp, 1/2 con rating, gasoline pone red <br /> -Hyd. Crane Grove RT58E rough terrain hydraulic crane, 20 ton capacity, 125 hp, 70 ft. boom <br /> -Fuel Truck 6x4, 3,600 gallon capacity, 210 HP, diesel powered <br /> -Cube Truck 6x4, 2,500 gallon capacity, 210 HP, diesel powered <br /> -Flatbed Truck: 30,000 lb GVLl, 210 HP, diesel powered <br />Last Update: __________________________________________ _________________ ________________ _______ ___ <br />August, 1997 (trucks) <br />------------ --------- Lt. Rig Med.Rig Hvy.Rig Pilot Hydraulic Fuel Lube Flatbed <br />Cost Breakdown: <br />_____________________ <=25 T. <br />__________ 26-50 i. > 50 T. Car Crane <br />__________________________________________ Truck <br />_________________ Truck <br />________________ Truck <br />__________ <br />__ <br />Ownership _________ <br />Cast/hr __________ <br />= E28.59 ______________ ___ <br />E28. 10 E31.38 E1.73 E24. 12 _______ <br />E6.88 ________________ <br />E12.66 _______ <br />E7. ___ <br />88 <br />Operating Cost/hr E2B.38 E30.17 E32.34 E4.82 E31.48 E19.57 E25.56 E11. 82 <br />Operator Cost/hr = E22.61 E22.61 E22.61 E21.82 E23.13 522.35 E21.24 E22. 35 <br />Helper Cost/hr = E21.82 E21.82 E21.82 E0.00 E0.00 E0.00 E0.00 E0. 00 <br /> Total = E9B.40 E102. 70 E108. 15 E28.37 E78.73 E48.80 E59.46 E42. 05 <br />NON-ROAOABLE EQUIPMENT: <br />---------------------- weight Ownership Naul Rig Fleet Size Haul Trip Return Trip DOT Permit <br />Machine Description <br />_________ (tons) Cos[/hr Cost/hr (no. hauled) Cost/hr Cost/hr Cost/ea <br />__________________ <br />D8N Dozer _____________ <br />6.00 ____________ <br />E37.34 ___________ <br />E98.40 _______________ <br />1 ____________ <br />E138. 74 _______________ <br />E98.40 ___________ <br />_ ______________________________________________ <br />Subtotals E135. 74 E98.40 E0.00 <br />