Laserfiche WebLink
<br /> <br />Table L-3 Estimated Number of Wells Requiring Reclamation <br />Year of Operation Estimated Number of <br />Wells Drilled per Yeaz Estimated Total Number of <br />Wells in Operation <br />during Year <br />1 26 26 <br />2 0 26 <br />3 15 41 <br />4 15 56 <br />5 15 71 <br />6 15 15 <br />7 15 30 <br />8 15 45 <br />9 15 60 <br />10 15 75 <br />L.1.2 Reclamation of Processing Facilities and Other Permanent Features <br />The initial processing facility components that would require reclamation include all of <br />the buildings and structures that will be constructed as "permanent items" to last <br />throughout the life of the project. Reclamation of these permanent project features <br />would normally only take place at the end of the Yankee Gulch Project. If for some <br />reason the project were to shut down during commercial operations, these same items <br />and quantities of materials would need to be reclaimed regardless of when the <br />shutdown occurred. A detailed layout of these structures is shown in Exhibit D, Figure <br />D-4, and the dimensions and composition of structures at the Piceance Site are <br />summarized in Table L-4. <br />Table L-4 Piceance Site Structures <br />Project Structure Dimensions Structure Composition <br /> (width, length, <br /> height in feet) <br />Buildings <br />Administration and 50 x 100 x 16 Steel with metal siding and flat roof <br />Laboratory <br />Heat Exchanger 75 x 140 x 36 Steel with metal siding and flat roof <br />Building <br />Compressor Building 55 x 160 x 18 Steel with metal siding and flat roof <br />Process Building 75 x 210 x 135 Steel with metal siding and flat roof <br />L-5 <br />