Laserfiche WebLink
<br />EXHIBIT N: RECLAMATION PZAN "CONTIMJED" <br />architect for the Department of Highxays was requested to <br />provide a seeding, mulching, and fertilizing plan to•be <br />• used in reclaiming the area, A copy of this plan is on <br />the following sheet. <br />It is unlmown at this time hox much of the overburden rill <br />be required in our construction work. However, approximately <br />the top six inches from the pit, plant, and stockpile areas <br />will be stripped and held in a stockpile. At the completion <br />of the gravel operation arty excess overburden will be spread <br />in the bottom of the gravel excavation. Then the stockpiled <br />• overburden x111 be spread uniformly over the pit, plant, <br />and stockpile areas which should result in a minimum topsoil <br />thickness of approximately six inches. <br />• <br />