Laserfiche WebLink
RECLAMATION PLAN • ~ Exhibit D <br />resoiling begins the topsoil/growth medium will be removed from the <br />stockpiles and spread over the site. The cost to rip this stone <br />would be cost prohibitive and would serve no purpose. The grasses <br />in this area are adapted to growing on thin soils. <br />The existing topsoil pile, on the east section where the rip <br />rap is removed, will be used to resoil that area. This is part of <br />the area we previously disturbed and was ordered to be reclaimed in <br />March 1997. The plan is to level the rip rap stone pile, and use <br />the waste from that pile to fill in the hole created, prelaw. The <br />topsoil will then be spread over the entire area at the proper <br />grade and revegetated with the proposed seed mixture. <br />Please see the Soils and Vegetation section in Exhibit B for more <br />site specific information on existing soils and vegetation. A road <br />will be retained on the site to allow access to this area and the <br />land to the north. <br />12 <br />