Laserfiche WebLink
<br />EXHIBIT "D" <br />The property has been mined in the past years with a front end <br />loader. This was started at the east side of the property. There <br />wasn't any reclamation work done on the pit and no reseeding of the <br />mined area. <br />It is the plan to start at the east side of the peroperty and <br />work to the west side of the property with the mining operations. <br />The actual removal of the gravel will be done with a front end <br />loader. The top soil will be removed with a front end loader or <br />other necessary equipment and stockpiled to be used to reclaim the <br />mined area. The gravel in the pit area is approximately ten feet <br />in depth. The slopes will be sloped in accordance with the <br />reclamation plan. <br />The mining operation will move in a westerly direction until <br />the area is completely mined. <br />The reclamation will be done as the mining operation progresses <br />on the property. <br />It is not anticipated that there will be any stockpiling of <br />gravel at the pit. <br />