Laserfiche WebLink
Coulson Excavating Company, Inc. -Stroh Gravel Pit <br />Exhibit D -Mining Plan <br />Figure 1). Additionally, a 3:1 slope will be maintained to the west and east of the Kaneb <br />Pipeline. Prior to any excavation, the exact location of the centerline of the pipeline will <br />be surveyed and flagged. <br />Asphalt Batch Plant <br />An asphalt plant will be placed near the northwest corner of Ce113 in the south zone at an <br />appropriate location and time (i.e., when that area has been mined out) to start the <br />processing of asphalt. <br />H:\Stroh\word\DMG\working_Exhibit D.doc <br />