Laserfiche WebLink
3XciI3IT C <br />-Ilning Flan <br />1. Th=_ mining will b=gin on or about March 18, 19~?• The operation <br />will continue for approximately 5 years and end on or about April <br />1st. 1992. <br />2. The topsoil deoth varies greatly in the affected ar_a. Auprox. <br />8 acres of the area to be mined contains 6" or less of topsoil. At <br />the too of the hill (';lectern permit boundary) the topsoil ranges from <br />o" to 48" deep. All toDSOil remounts foun3 will be stockpiled Sn <br />vrindrorrs running north to south along vrestern permit boundary. These <br />windro:rs will be located 25' west of :the western permit boundary. These <br />vrin3rovrs will be seeded to nati-v. ~,r~ss as they arE created. <br />3. tdo overburden exists in the affected area. <br />4. T::".e deposit depth of the gravel varies as folloc•rs: 3ast permit <br />boundary- approx. 12 feet thick. ::est permit bcun3a~ry- approx. 25 <br />f=et thick. These depths vary as the area is located on the side of <br />a hill 1n the slope. <br />5. The existing rorids on our property will serve as access to the <br />mining area. <br />o. The mining area will be a L-shaped excavation starting at the lovrer <br />end of the hill Gast boundary) and continuing up to the top of the hil <br />(:lest boundary). <br />7. The existing rDads are 30' aide and are graveled. <br />8. No water vrill be used Sn this operation. <br />g. Vo ground crater will be encountered or distured. <br />10. Vo water rights pertain to this area to be mined. at this time. <br />11. The deposit will not be processed on site. <br />'rage 3 <br />