My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE66808
DRMS
>
Back File Migration
>
Permit File
>
700000
>
PERMFILE66808
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:12:33 PM
Creation date
11/20/2007 9:33:13 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1999002
IBM Index Class Name
Permit File
Doc Date
4/20/1999
Doc Name
TR 1 TO APPLICATION GEOTECHNICAL ENGINEERING STUDY UPPER PLANT SITE
From
AMERICAN SODA
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
M98168GE <br />16.0 LIMITATIONS <br />It is the owner's and the owner's representatives' responsibility <br />to read this report and become familiar with the recommendations <br />and suggestions presented. We should be contacted if any questions <br />arise concerning the geotechnical engineering aspects of this <br />project as a result of the information presented in this report. <br />The recommendations outlined above are based on our understanding <br />of the currently proposed construction. we are available to <br />discuss the details of our recommendations with you and revise them <br />where necessary. This geotechnical engineering report is based on <br />the proposed site development and scope of services as provided to <br />us by Mr. Mark Drzewiecki, Project Procurement Manager, Kvaerner <br />Metals, on the type of construction planned, existing site <br />conditions at the time of the field study, and on our findings. <br />Should the planned, proposed use of the Bite be altered, Lambert <br />and Associates must be contacted, since any such changes may make <br />our suggestions and recommendations inappropriate. This report <br />should be used ONLY for the planned development for which this <br />report was tailored and prepared, and ONLY to meet information <br />needs of the owner and the owner's representatives. In the event <br />that any changes in the future design or location of the building <br />are planned, the conclusions and recommendations contained in this <br />report shall not be considered valid unless the changes are <br />reviewed and conclusions of this report are modified or verified in <br />writing. It is recommended that the geotechnical engineer be <br />provided the opportunity for a general review of the final project <br />design and specifications in order that the earthwork and <br />foundation recommendations may be properly interpreted and <br />implemented in the design and specifications. <br />This report does not provide earthwork specifications. we can <br />provide guidelines for your use in preparing project specific <br />earthwork specifications. Please contact us if you need these for <br />your project. <br />This report presents both suggestions and recommendations. The <br />suggestions are presented so that the owner and the owner's <br />representatives may compare the cost to the potential risk or <br />benefit for the suggested procedures. <br />This report contains suggestions and recommendations which are <br />intended to work in concert with recommendations provided by the <br />other design team members to provide somewhat predictable founda- <br />tion performance. If any of the recommendations are not included <br />23 <br />Lambert ana ~~~ociateo <br />COM[ULTIMO OlOTlCMMKJL lMOIM!!q •MD <br />Y~Tl~I~L lClTIMO <br />
The URL can be used to link to this page
Your browser does not support the video tag.