My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE66808
DRMS
>
Back File Migration
>
Permit File
>
700000
>
PERMFILE66808
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:12:33 PM
Creation date
11/20/2007 9:33:13 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1999002
IBM Index Class Name
Permit File
Doc Date
4/20/1999
Doc Name
TR 1 TO APPLICATION GEOTECHNICAL ENGINEERING STUDY UPPER PLANT SITE
From
AMERICAN SODA
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
M98168GE • . <br />Level Backfill <br />foundations in intimate contact with the <br />formational material <br />(pounds per cubic foot per foot of depth) <br />Active L.E.P. 30 <br />At-rest L.E.P. 45 <br />Passive L.E.P. 500 <br />Resistant forces used in the design of the walls will depend on <br />the type of soil that tends to resist movement. We suggest that <br />you consider a coefficient of friction of 0.3 for the on site soil <br />and a coefficient of friction of 0.4 for foundations with intimate <br />contact with the formational material. <br />The lateral earth pressure values provided above, for design <br />purposes, should be treated as equivalent fluid pressures. The <br />lateral earth pressures provided above are for level well drained <br />backfill and do not include surcharge loads or additional loading <br />ae a result of compaction of the backfill. Unlevel or non-horizon- <br />tal backfill either in front of or behind walls retaining soils <br />will signif'_cantly influence the lateral earth pressure values. <br />Care should be taken during construction to prevent construction <br />and backfill techniques from overstressing the walla retaining <br />soils. Backfill should be placed in thin lifts and compacted, ae <br />discussed in this report to realize the lateral earth pressure <br />values. <br />Walls retaining soil should be designed and constructed so that <br />hydrostatic pressure will not accumulate or will not affect the <br />integrity of the walls. Drainage plane should include a subdrain <br />behind the wall at the bottom of the backfill to provide positive <br />drainage. Exterior retaining walls should be provided with perime- <br />ter drain or weep holes to help provide an outlet for collected <br />water behind the wall. The ground surface adjacent to the wall <br />should be eloped to permit rapid drainage of rain, snow melt and <br />irrigation water away from the wall backfill. Sprinkler systems <br />should not be installed directly adjacent to retaining or basement <br />walla. <br />9.0 DRAIN SYSTEM <br />A drain system should be provided around building spaces below <br />the finished grade and behind any walla retaining soil. The drain <br />systems are to help reduce the potential for hydrostatic pressure <br />17 <br />Lambert ana ~,o~otiateo <br />COM WLTIMO OlOTlCMMIC~L f MOO1!!q •MO <br />Y/Tl~I~L Tf/T~MO <br />
The URL can be used to link to this page
Your browser does not support the video tag.