Laserfiche WebLink
PART I <br />Page 7 of 19 <br />E. SPECIAL RDQUIRIIgSTTS <br />1. Materials Containment Plan (Qxlti.fnled) <br />e) An implementation schedule for additional facilities whidi might <br />be required in item c, but which are not yet operational; <br />f) A list of available outside contractors, agencies, or other <br />sav.~ees which could be utilized in the event of a spill in order <br />to clean up its effects. If the facility is capable of handling <br />spills in-house, this shall be doamiented in the plan: <br />g) Provision for yearly review and updating of the contingency plan, <br />plus resubmi_uion of the plan to the Division if conditions and/or <br />procedures at the facility ~e the original plan. <br />The foregoing provisions shall in no way ruder inapplicable those <br />requiL~~ts imposed by Section 311 of the Water Pollution Control Act <br />Amerx~nents of 1972, regulations prc~ulgated thereunder, the Colorado <br />Water Quality Control Act, and regulations promulgates theretuxier. <br />This plan should be prepared by a professional engineer iegistere3 in <br />the State of Colorado. <br />Nothing herein contained shall be oonsstrued as allowing any discharge <br />to waters oP the State other flan thxwgii the disdarge points <br />• specifically authorized in this permit. Nothing herein oontairrd <br />shall be construed as exwsfng any liability the peroittee might have, <br />civil or criminal, for any spill. <br />Cade: <br />The submittal of a Spill Preva~timl Control and Cotmtenaensure Plan <br />(SPCC Plan) as required by 40 CFR Part 112 may satisfy all ar part of <br />this requirenent. Should additional ~e~ai~ exist an site which are <br />not add_*~~ in the SPCx Plan, addressing those materials as per the <br />above is required. <br />i - 21 Date: 1-84, revised 12-88 <br />• <br />:. <br />, <br />