Laserfiche WebLink
-.. i <br />Page lh of 19 <br />Permit No. CD-0033367 <br /> <br />B. I3~N1Tt7RtrTG I2DQ[JIItEMENI'S <br />2. Reportira of Data (Oontirtued) <br />U.S. FtNirr~en>ntal pjgteG-lien jlLJpllL~r <br />Denver Place <br />999 18the Street, Suite 500 <br />Denver, ~ 80202-2405 <br />Attention: hater Management Division <br />Compliance Branch 8AM-C <br />See Part I.C. for Fbotnotps. <br />3. Four Time Analysis <br />In order to develop a sufficient data base for proper evaluation of the <br />water quality impact of the disdlanZe, the permittee shall monitor the <br />following parameteS at the specified discharge point on a quarterly basis <br />for four sets of data. A report of 'TIO Discharge" shall not be counted as <br />one of the far sets. Upon submission of the fourth set of data the <br />permittee shall attac3: a statement advising the Permits arr] E2lforcement <br />Section, Water Quality Cmltzol Divisicn that all four sets of data have been <br />submitted. <br />C~ <br />Parameter m~+a*~ Point <br />Discharge Point 002 <br />Alumirnmt, Dissolved, mg/1 002 <br />Saamle Type <br />GYab <br />If evaluation of the data demonstrates a definite or pzt3~able <br />violatial of water quality stand~-irds, the permit may be amended to <br />irrroxpoiate additional monitoring and limitations as allowed under <br />Part II.B.S of this permit. Additional monitoring may also be <br />required where the detection limit far a parameter is above the <br />appmopriate water quality standards. <br />Storm E~oeawwtian at 003 and 004 <br />If the permittee intencLs to use the 10~+ear, 24-hot~x' storm exemption, a <br />report must be submitted within 90 days after the effective date of this <br />permit, doaaaenting that the facility is designed, constructed and will <br />be maintained to contain or treat: <br />(a) The maximmi wlume of wastewater which would be generated by the <br />facility during a 24-has period without an increase in volume <br />fmu precipitation: and <br /> <br />