Laserfiche WebLink
<br />Exhibit E -Reclamation Plan <br />1. The reclamation plan for The Shores includes creation of a 112 acre lake. The applicant has <br />stated on page 21 of the application that "We are in the process of applying for a well permit and <br />required temporary substitute supply plan to augment evaporative loss from the ponds." <br />Therefore, until such time that the applicant can demonstrate approval of adequate water rights <br />not only for operational needs during mining but also evaporative loss following creation of the <br />112 acre lake, the Division will require a either 1) a financial warranty adequate to cover the cost <br />of backfilling the pond/lake azea to at least 2 feet above the highest groundwater elevation <br />monitored, and a plan and commitment for monitoring the groundwater elevation near the <br />excavation, or 2) an alternate reclamation plan (and cost) that does not involve exposed <br />groundwater. <br />~~,~d~~~ <br />~3" <br />Y 2. The applicant has provided on pages 22-24 a reclamation seed mix and list oftrees/shrubs that <br />may be planted. Based upon the vegetation information provided in the Weld County Soil <br />Survey, the Division recommends that you incorporate the following seed mix and trees/shrubs <br />for reclamation of "The Shores" site. <br />THE SHORES - RECLAMATION SEED MIX TREES/SHRUBS <br />Species % of Mix Rate (Ibs. PLS./A) * <br />Little Bluestem 15 0.5 Rocky Mountain Juniper <br />Sand Bluestem 20 3.0 Eastern Redcedar <br />Sand Dropseed * 15 l.0 Ponderosa Pine <br />Blue Grama 15 0.5 Siberian Elm <br />Switchgrass ]0 0.5 Hackberry <br />Sideoats Grama 10 I.0 Skunkbush Sumac <br />Western Wheatgra ss ] 0 1.5 Siberian Peashrub <br />Needle & Thread 5 1.0 Lilac <br />Blue Flax - 0.5 <br />Total <br />100 <br />9.5 <br />* Double rate for broadcast seeding <br />** May substitute prairie sandreed if sand dropseed is not available <br />Exhibit G -Water Information <br />~r ~ <br />~y~y <br />J 1. The application lists on pages 27-29 projected water requirements for the mining operation <br />and reclamation, as required by Rule 6.4.7(4). Megan Sullivan of the Office of the State <br />