Laserfiche WebLink
1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />use •~scs <br />scs-c oHS-ee <br />REV. )~)3 <br />RECORD OF COOPERATOR'S DECISIONS <br />AND PROGRESS IN APPLICATION <br />COOPERATOR Valrn_ Tn r- <br />ASSISTED BY ilanni c Rnykin <br />DATE Fi-lli_77 <br /> PLANNED APPLIED <br />FIELD MONTH LAND USE AND TREATMENT <br />N0. AMOUNT YEAR AMOUNT AND <br /> YEAR <br /> CONSERPATION TREATMENT UNIT N0. 1 - <br /> RANGELAND - Field N0. 2 - 132 Acres <br />2 1j2 Acres 1977 PROPER GRAZING IISE <br /> IIse and manage to graze half and leave half <br /> (by weight) of the annual growth of grasses. <br /> See enclosed Form SCS-Range-LI].1y for further <br /> guidance on proper grazing use. <br /> CONSERPATION TREATMESPP IINIT N0. 2 - <br /> CONII~IERCIAL INDIISTRIAL LAND - Field N0. 1 - <br /> 120 Acres <br /> Begin <br />1 120 Acres 1977 CRITICAL AREA PLP-NTING <br /> Beginning this year surfaced mined gravel pit <br /> will be reseeded at the time of abandonment. <br /> Reseeding will be accomplished according to t <br /> following practice specifications. <br /> (1 ). Topsoil Removal - Topsoil will be remove <br /> and stockpiled prior to gravel pit operations <br /> (2). Construction - All banks will be shaped <br /> and graded to a 3:1 grade or flatter. <br /> (j). Topsoil Application - Topsoil removed <br /> from construction will be uniformly applied <br /> after shaping and grading. Topsoil will be <br /> tilled into soil surface during seedbed <br /> preparation. <br /> (!~). Seedbed Preparation - Seedbed shall be <br /> loosened to a depth of 6" and smoothed. <br /> Disking or cultipacking or both may be <br /> necessary. Trash and other debris that may <br /> interfere with seeding shall be removed from <br /> the site. <br /> 18 <br /> <br />