Laserfiche WebLink
1 <br />.1 <br /> <br /> <br /> <br />1 <br /> <br />~~ <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />1 <br /> <br /> <br />EXHIBIT E (Cont'd) <br />slope using a grass drill capable of handling the seed mix- <br />ture. <br />Fertilizer. All areas to be seeded will be fertilized <br />with 45 pounds of nitrogen and 45 pounds of available <br />phosphorus per acre. The fertilizer will be granular and <br />will be applied uniformly over the entire seeded area. <br />Mulch. A straw mulch will be applied at the rate of <br />approximately 5,000 pounds per acre. A disc will be used <br />to anchor the mulch material. <br />Shrubs, Browse, Trees. The reclamation plan does not <br />include the planting of any shrubs, browse or trees. <br />Reclamation Timetable. Work has been commenced on the <br />reclamation of Stage 0 and is expected to be completed by <br />1980. Stage I is presently being mined. The reclamation <br />phases listed below may be correlated to map Exhibits D <br />and F. The phases correspond to the mining stages and are <br />numbered accordingly. The reader should be aware that these <br />are estimates only and that variations may occur. <br />11 <br />