Laserfiche WebLink
g. (i) See Reclamation Plan and Details (Attached <br />plan sheet as Exhibit F). <br />(ii) See Exh~;bit AA - Applicant to comply with <br />SCS recommendat:j,ons. <br />(iii) Fertilization will be accomplished at time <br />of seeding operations. <br />(iv) See Exhibit E, paragraph c-5. <br />(v) See Exhibit E, paragraph c-4. <br />EXHIBIT F - Reclamation Plan Map - See attached map. <br />EXHIBIT G - Water Information <br />The reclaimed operation is expected to have lIa very <br />minimal effect upon other water systems in dhe area. <br />The reclamation land use of open space and ~jildlife <br />habitat will not consume ground water, othe~j than <br />minor evaporative and transpirative losses. The <br />impounded water will seek a level equal to that of <br />the natural water table. The underground w er table <br />in the area surrounding the site will be rel tively <br />unaffected by the reclaimed area. <br />Water from dewatering operations will be pumped into <br />ponds developed on-site for that purpose. A11 <br />excavations and piled materials will be sloped so <br />that runoff from disturbed areas will flow into the <br />ponds created and designed for that purpose.' <br />Wastes from machinery maintenance will be co~fined to <br />localized areas so that none of those wastes reach <br />water areas. <br />There will be no project water requirements nor <br />development mining areas, other than occasio~ial dust <br />control operations. The amount of water needed for <br />dust control is not expected to exceed 1,000gallons <br />per week during dry conditions. The water w~ll be <br />purchased from the City of Greeley system or~the <br />North Weld County Water District. The applicant <br />intends to spread excavated sand and gravel bn haul <br />roads, thereby greatly limiting the need formdust <br />control measures. ; <br />EXHIBIT H - Wildlife - See Exhibit E, paragraph c-3. <br />EXHIBIT I - Soils - See Exhibit AA. <br />EXHIBIT J - Vegetative - See Exhibit AA. <br />