Laserfiche WebLink
STOUT-AMICK PIT <br />EXHIBIT E--RECLAMATION PLAN <br />PIT RECLAMATION. <br />AS S7A7CD IN PHASE ND. 1 MINING PLAN, OVERBURDEN MILL BE PLACED OVER <br />THE PIT AREA, SlOPfS CONSTRUCTED 70 NOT STEEPER THAN 3:~ AHD TOPSOIL PLACED <br />UNIFORMLY DYER THE PIT AREAS. PHASE ONE CAN 6E RECLAIMED AFTER OPERATIONS <br />ARE COMPIETCD MITMIN ITS AREA MOVEVER PHASE Z AND 3 CANNOT BE RECLAIMED <br />UNTIL PHASE 3 IS EXHAUSTED SINCE THE ONLY PLACE TO STOCKPILE OVERBURDEN AND <br />TOPSOIL FROM PHASE 3 IS IN PHASE Z TMCREBY RE OUIRING THAT PHASES Z AND 3 BE <br />SEEDED AND FINALLY RECLAIMED AT THE SAME TIME. <br />$TOCKPILE AND PLANT AREA. '~ <br />TERRACES CONSTRUCTED FOR STOCKPILE AND PLANT LOCATIONS VILL BE OBLITER- <br />ATED BY PLACING THE FILL GENERATED BY EXCAVATING THE TERRACES BACK INTO THE <br />IERRACC EXCAVATION AREA. HOVEVER NO SLOPE RECONSTRUCTED 41LL BE STEEPER <br />THAN 3:~. THE TOPSOIL STOCKPILED IN THE NORTH 2 OF THE STOCKPILE AND PLANT <br />AREA 41LL BE REPLACED OVER THE REBUILT AREAS AND ALL AREAS MILL BE SEEDED <br />AS RECOMMENDED BY SC S. <br />MAIN ACCESS ROADS TO THE PLANT AREA AND THE E%HAUSTED GRAVEL PITS VILL <br />REMAIN AND NOT BE RECLAIMED. THIS IS TO PROVIDE OPERATIONAL AND MAINTENANCE <br />ACCESS TO THE PERMIT ARCA. <br />