• 2.05.4 Reclamation Plan <br />(1) A plan for reclamation of the lands within the proposed permit <br />area. <br />(2) Information for the proposed permit area: <br />(a) A detailed timetable for the completion of each major step in <br />the reclamation plan. <br />The underground development waste disposal area was the only area <br />where reclamation was anticipated to occur concurrent with mining. <br />However, the mine was reclaimed during 1988 and no permanent <br />reclamation was performed on the waste disposal area prior to that <br />time. <br />The mining operation went into temporary cessation on April 11, 1984, <br />due to a depressed coal market. In early 1986 the Delta Loadout was <br />reclaimed. Coal waste from the Delta Loadout was hauled to and <br />placed in the mine site underground development waste disposal site. <br />The disturbed areas at the Delta Loadout were seeded to promote a <br />ground cover. Final bond release was issued for the Delta Loadout in <br />1987. <br />The intake, belt portals and return shaft were sealed in August, 1966 <br />to eliminate ventilation and maintenance expenses. A portion of the <br />underground development waste pile was covered with 9" of overburden <br />in the fall of 1986 and seeded with the temporary seed mix listed in <br />section 2.05.4(2)(e)(ii). <br />The mine was reclaimed during 1986. Remaining reclamation includes <br />drill hole abandonment which will be performed during 1996 and 1997. <br />(b) A detailed estimate of the cost of reclamation of the proposed <br />operations. <br />The cost of reclamation is presented by dividing the disturbed area <br />into major sub-areas of disturbance. The sub-areas are shown on <br />table 2.05.4(2)(b)-3. The total completed reclamation costs are <br />presented on table 2.05.4(2)(b)-4. This table also presents the <br />estimated remaining costs to complete the reclamation. The total <br />completed reclamation costs were the actual costs to reclaim the <br />site. <br />(c) A plan for backfillinq, soil stabilization, compacting, and <br />grading with contour maps. <br />The following discussion presents a description of the 1968 <br />reclamation project and the remaining reclamation to complete. The <br />reclamation work described for areas 1 through 5 was performed during <br />the 1988 reclamation project. Drawing 2.05.4(2)(c)-1 presents the <br />final contour map for the mine site. <br />u <br />126 (Rev. 3-29-96) <br />