Laserfiche WebLink
<br />Colorado Division of Ninerels erd Geology sheet 7 of 2 <br />ESTIMATING FORN - EDUI PNEMT M081L12ATION / DEMOBILI2ATIOM <br />Task I... 3 Prep. by JD Filervwne..M081-3 <br />Date..... 28-Nov-94 Permit / N-94-OB1 Mine......Peat Mine <br />Permit Action........ Final Reclamation <br />Task Description..... Mob/demob Equipment <br />HOURLY EWIPMENT COST <br />______ _____________= NOTE - This is a list to select from, not a li st of mandatory items to inc lude. <br />Mob/Demob Ems. -Tractor 6x4, 75,000 lb GW, 375 HP, diesel powered <br />-Lt. Trailer 25 tan folding gooseneck, drop deck <br />-Med. Trailer 50 ton folding gooseneck, drop deck <br />-Hvy. Trailer 120 Ton folding gooseneck, drop deck <br />-Pilot Cer On-hi ghuay light duty truck, 4x2, 130 hp, 1/2 ton rating, gasoline powered <br />-Xyd. Crane Grove RT58D rough terrain hydraulic Crane, 20 tan capacity, 125 hp, 60 ft. boon <br />-Fuel Truck 6x4, 3,600 gallon capacity, 210 NP, diesel powered <br />-Cube Truck 6x4, 2,500 gallon capacity, 210 HP, diesel powered <br />-Flatbed Truck: 20,000 lb GW, 175 HP, diesel powered <br />Lest updete: "--"------------_"__'_---------------------- ---~__-_'- '--_----------__' ___________ <br />May, 1991 <br />--------------- Lt. Rip Med.Rig Hvy.Rig Pilot Hydraulic Fuel Lute Flatbed <br />Cost Breakdown: c=25 T. 26-50 T. > 50 T. Car Crane Truck Truck Truck <br />Ownership Cost/hr = (26.78 229.16 (37.74 21.39 f19.89 f6.02 (10.66 f6.70 <br />Operating Cost/hr = (23.23 224.76 229.92 f4.05 f23.40 216.19 220.71 f7.47 <br />Operator Cost/hr = 520.54 (20.54 520.54 219.81 f20.86 f19.97 (19.97 f19.97 <br />Helper Cost/hr = f19.81 f19.81 f19.81 50.00 20.00 20.00 20.00 .f0.00 <br />Totet = f90.36 294.27 (108.01 225.25 264.15 (42.18 f51.34 534.14 <br />NON-ROADABLE EWIPMENT: <br />--------------------- Yeight Ownership Haul Rip Fleet Size Haul Trip Return Trip DOT Permit <br />Machine Description (tons) Cost/hr Cast/hr (no. hauled) Cost/hr Cost/hr Lost/ee <br />Cat 120 Motorgrader 12.70 212.97 (90.36 1 (103.33 f90.36 <br />Seeding Equipment 10.00 (20.00 290.36 1 (110.36 (90.36 <br />Subtotals 5213.69 !180.72 f0.00 <br />