Laserfiche WebLink
<br /> <br />construction, all wetlands in the vicinity of the project will be surrounded with a temporary snow <br />fence. <br />Quantities of Fill <br />Approximately 100 cu.yds. of concrete and 180 cu.yds, of structural fill will be placed below the <br />ordinary high water for construction of the intermediate pier. Roughly 2100 sq.ft. of channel bed will <br />be disturbed by this action. Some temporary fill will be placed below ordinary high water to facilitate <br />construction, however, the combined permanent and temporary fill will not exceed 0.33 surface acres <br />in extent. The temporary fill wi11 be removed of in its entirety and disposed in an upland area. <br />Schedule <br />Bridge construction is scheduled to occur during the spring and summer months of 1994. <br />Orchid Survev <br />A field survey to determine the existence of the Ute ladies tresses orchid (Spiranthes dilwialis) in <br />the vicinity of the crossing is currently underway. Results of the survey will be forwarded directly to <br />the U,S. Fish and Wildlife Service. <br />Please call me at 442-5770 if you have any questions, and thank you for your attention to this <br />matter. <br />Sinter , <br />r <br />Lauranne P. Rink <br />President <br />ce: Mike Figgs, LREP <br />Paul Banks, SHB Agra, Inc. <br />f Darrel Buffington, SHB Agra, Inc. <br />z <br />