Laserfiche WebLink
<br />ti. • • <br />~~ <br />~._~ <br />~~ ~~ <br />~~ ~--~ <br />~~ ~~ <br />~~ ~~ <br />~=- TUTTLE APPLEGATE RINDAHL, INC. <br />Consultants for Land and Resource Development <br />Mined Land Reclamation Division <br />March 9, 1989 <br />Page 2 <br />Water will be applied to haul areas by tanker trucks as required <br />for dust control, to 3 times daily if necessary. Excavation dust <br />will be controlled primarily by natural soil moisture, and <br />minimizing overall time of disturbance. Noise will be controlled <br />by site relief and setback distances. The nearest residence is <br />over 1,500 feet from the excavation, and sits some 20' above the <br />top of excavation and some 40' above the bottom of pit, where a <br />good portion of the noise will be generated. <br />If you find that you are lacking necessary materials or have <br />questions and concerns, please contact us immediately. We will <br />get the required items to you as quickly as possible. Thank you <br />very much for your help on this important matter. <br />Sincerely, <br />TUTTLE APPLEGATE RINDAHL, Inc. <br />Daniel P. Giroux, P.E. <br />DPG/dpg <br />Encls. <br />cc: Bob Allen, C & M Companies <br />File A 88-161LS <br />