Laserfiche WebLink
<br /> <br />3. Reclamation: Reclamation should be implemented concurrent with construction and <br />site operations to the fullest extent possible. Final reclamation actions shall be initiated <br />within xis months of the termination of operations unless otherwise approved. Disturbed <br />areas shall be restored as nearly as possible to the original contour. Distribute stockpiled <br />top soil evenly over the disturbance and prepare a seed bed by disking or ripping. Dri11 <br />seed on contour at a depth no greater than %a inch. Seed disturbed areas with Western <br />wheatgrass (Arriba) 31bs/acre, Pubescent wheatgrass (Luna)216slacre, Russian wildrye <br />(Bosoiskv)216s/acre, Crested wheatgrass (Fairway/Ephraim)21bs/acre, Fourwing saltbrush <br />(Wytana/Rincon) ?lbs/acre. <br /> <br />