My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-04-06_PERMIT FILE - M1999040
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M1999040
>
1999-04-06_PERMIT FILE - M1999040
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2021 6:55:51 AM
Creation date
11/20/2007 9:12:54 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1999040
IBM Index Class Name
Permit File
Doc Date
4/6/1999
Doc Name
RED WASH GRAVEL PIT FN M-99-040 RECEIPT OF 110 CONSTRUCTION MATERIALS RECLAMATION PERMIT APPLICATION
From
DMG
To
RIO BLANCO CNTY
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(v) Mulch is recommended with clean, weed free straw at two tons per acre. <br /> Mulch must be properly crimped into the soil with a disc or mulch <br /> crimper. <br /> (vi) No shrubs or trees are to be planted. <br /> D. No ponds, streams, or buildings will remain after reclamation. <br /> E. During both mining and reclamation the prevailing hydrologic balance of the <br /> affected land and the surrounding area will not be adversely affected. <br /> F. The following is an estimate of reclamation costs. Reclamation costs are limited <br /> to shaping the site, placing the top soil, and re-vegetation. <br /> Shaping: <br /> Shaping the pit is done with a dozer. It is estimated that a dozer and operator can <br /> shape 0.2 acres per hour of reclaimed pit. <br /> Mobilization (from Rangely) <br /> Equipment cost: $60.00 per hour or $300.00 per acre <br /> Labor cost: $30.00 per hour or $150.00 per acre <br /> Total Shaping $450.00 per acre <br /> Placing Top Soil: <br /> Placing top soil is done with a scraper. A scraper with a capacity of 16 cubic yard <br /> load wil I take 5 hours to place top soil on 1 acre of reclaimed pit. Production rate <br /> is 10 loads per hour. <br /> Mobilization (from Rangely) <br /> Equipment cost: $65.00 per hour or $325.00 per acre <br /> Labor cost: $30.00 per hour or $150.00 per acre <br /> Total placing top soil $475.00 per acre <br /> Re-vegetation: <br /> Seed and application $700.00 per acre <br /> TOTAL RECLAMATION COST: $1625.00 per acre <br />
The URL can be used to link to this page
Your browser does not support the video tag.