Laserfiche WebLink
CIRCES Cost Estimating Software <br />. ............... <br />PROJECT IDENTIFICATION <br />Task # : 01C <br />Date : 02/10/2003 <br />User: GRM <br />State :Colorado <br />County :Mesa <br />Site :15 Road Gravel Pit <br />Permit/job# : M-2002-114 <br />Abbreviation :none <br />Filename :M114-O1o <br />Agency or organization name : DMG <br />Permit or otherjob action :Final Reclamation Costs Estimate <br />Task description :Establish final grade of 3H:1V slopes with overburden <br />HOURLY EQUIPMENT COST <br />Basic machine : Cal08R Series 11- 8SU Horsepower : 310 <br />Blade type :Semi-Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2 :3-shank ripper <br /> Data source : (CRG) <br />Utilization <br />Cost Breakdown ~ Ownership cost/hour : $50.51 Nq <br />Operating cosUhour : $63.93 100 <br />Ripper op. cosUhour : $1.89 25 <br />Operator cosVhour : $30.65 Nq <br />Total unit cosUhour : $146.98 Total fleet cosUhour: $148.98 <br />HOURLY PRODUCTION Job Condition Correction Fact ~ ~~ ~~ <br /> ors Source <br /> <br />Average push distance : <br />50 <br />feet Operator skill : 0.75 (avg.) <br /> <br />Unad"usted hourl <br />1 y production : <br /> <br />1 <br />400 <br />0 <br /> <br />LCY/hr Material consistency : 1.20 <br />(CatHB <br /> , <br />. Dozing method : 1.00 (gen.) <br /> <br />Material consistency description <br />: Visibility: 1.00 (avg.) <br /> <br />Loose stockpile Job efficiency : 0.83 <br />(lshiff/dai <br /> Spoil pile : 0.80 (fnd-r~ <br /> <br />Average push gradient : <br />16.50 <br />% (neg) Push gradient : 1.36 (Cat HB) <br /> <br />Average site altitude : <br />4,460 <br />feet Affitude : <br />Material weight : 1.00 <br />0 <br />79 (Caf HB) <br /> . (Cat HB) <br /> <br />Material weight : <br />2,900 <br />Ibs/LCY Blade type : <br />Net correction : 1.00 <br />0 <br />64 (S/SU/U) <br />Weight description . <br />Decomposed rock - 50% Rock, 50% Earth Adjusted unit production : 901.35 LCY/hr <br /> Adjusted fleet production : 901.35 LCY/hr <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) Total job time : 27.74 Hours <br />Unit cost : $0 163 /LCY Total job cost : $4,077 <br />