CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br /> Agency or organization name : DMG <br />Task#: 01b State:Co/orado Permiujob#:M-2002-114 <br />Date : 02/10/2003 County :Mesa Abbreviatlon :none <br />User: GRM Site :lSRoad Gravel Pit Filename :M714-Ofb <br /> <br />Permit or other job action :final reclamation costs estimate <br /> Task description :placement of overburden to achieve 3H:1 V slopes in Area 5 <br />HOURLY E QUIPMENT COST <br />- Model :Cat 633E Series 2 Shik basis : 1 per day <br />Cost Breakdown : Job utilization % Horsepower : 490 <br /> Ownership cosuhour : $72.62 NA ~ Weight (UST) : 56.34 <br /> Operating bosuhour : $110.00 100 - Cost data source : (CRG) <br /> Operator cosuhour : $30.84 NA <br /> Total unit cosuhour : $213.46 Total Fleet cosuhour : $426.92 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume: 25,000 LCY factor: NA volume: 25,000 LCY <br /> Source of quantity take-off :application volume estimate <br /> Source of estimated swell factor : NA <br />Haulinc Caoacitv <br />Basis <br />Scraper Bowl (volume) Basis <br />Material weight: 2,900 pounds <br />Matedal description <br />Decomposed rock - 50% Rock, 50% Earth <br />Rated payload : 82,000 pounds <br />Payload capacity : 28.28 LCY <br />Cvcle Time (load + haul + soread + return) <br />Travel time <br />Struck volume : 23.20 LCY <br />Heaped volume : 34.00 LCY <br />Average volume : 28.60 LCY <br />Adjusted capacity : 28.28 LCY "' <br />Loading time: 0.90 minutes' <br />Maneuver and spreading time : 0.70 minutes <br />' tootling time per pair on push-W II motlels <br />Route Distance (feet) Grade (%) Roll. res.(%) Total res.(%) Velocity (fpm) I Travel time (min.) <br />Haul: 600 0.0 5.0 5.0 1,375 j 0.44 minutes" <br />Return: 600 0.0 5.0 5.0 2,288 0.26 minutes" <br />"travel time adjusted for acceleration antl deceleration at loatl and durtp points <br />velocities are max. attainable per total resistance sham, not ave2ge <br />Job Condition Correction Factors <br />Site altitude (feet) : 4,460 . <br />Altitude adjustment factor : 7.00 (Cat HB) <br />Job efficiency factor : 0.83 (1 shiff/day) <br />correction factor : 0.83 <br />JOB TIME AND COST <br />Fleet size : 2 Sc2per(s) <br />Unit cest : $0.348 /LCY <br />Total cycle time 2.30 minutes <br />Adiusted Hourlv Production <br />Unadjusted unit producton : 738.08 LCY/Hour"` <br />Adjusted unit production : 612.61 LCY/Hour <br />Adjusted Fleet production : 1,225.21 LCY/Hour <br />2 times volume on push-pull matlels <br />Total job time : 20.40 Hours <br />Total job cost : $8,711 <br />