Laserfiche WebLink
6. Inspections to be performed by persons trained and directed <br />• in inspection procedures. The inspections are to be checked at least <br />quarterly and after heavy rainfall or snow melt. runoff. <br />7. All inspections will be noted in a book to be stored in the <br />mine superintendent's office. The notations will be signed by super- <br />intendent of mine or designated person and person performing inspec- <br />tion. <br />BOOK FORMAT <br />DATE ~ It]SPECTION REMARKS ~ SIGt7ATURES <br />If a potentially hazardous condition develops: <br />A. Action will be taken to eliminate the condition. If time <br />permits, a consultation with a registered professional engineer will <br />be sought. <br />B. MSHA District Manager will be notified. <br />C. Inspection of the dam will be required at least once every <br />• eight hours. <br /> <br />