Laserfiche WebLink
iii ~iiiv~~~iiu iii <br />.;ovenber 13, 197J <br />Suburbazi Sand S Gravel Company <br />5360 SsTadsworth Blvd. <br />Llrvada, Colorado u0002 <br />RL: itoad Runner Rest II Pit <br />Our F31e No. 79-I95 <br />Dear Pir. Craft: <br />Ir. order to consider this application adequate for the January 23-24, 1980, <br />meeting of the i7laed Land Reclamation Board, tae will need the fallowing: <br />A. Exhibit D - i•:ininE Plan and Timetable <br />1. Due to the delays encountered in this mine application, what is <br />the revised date that mining will commence? <br />2. Will this mine have any adverse effects on the buildings located <br />within 200 Peet of the boundary? <br />3. Exactly where will the setback areas for topsoil and excess over- <br />burden stockpiles be located? <br />4. Topsoil which will be stockpiled for more than 1 year should have <br />the, cover crop planted. <br />H. Exhibit E - Reclamation <br />1. How many inches of topsoil will be replaced? <br />2. A soil sample should be taken after replacing the topsoil in Phase <br />I to determine what fertilizer ie actually needed. Thereafter, Boil <br />samplna should be taken as needed. <br />