Laserfiche WebLink
~ ~~ <br />RECLAMATION COST ESTIMATE <br />Drive, parking azeas, processing areas, previous pits and trenches. <br />a) though much of the reclamation will be done on site with in house equipment, it is <br />foreseen the requirement of having to rent a D-8 Cat to scarify approximately 1.7 <br />acres prior to spreading topsoil .......................................$ 360.00. <br />b) Topsoil onsite to be spread over 1.7 acres with a D-8 Cat. Approximately five <br />hours will be required @ 180.00 dollars per hour (includes operator and <br />equipment rental) .........................................................$ 900.00. <br />Re-vegetation <br />a) Fertilizer for one acre. A total of 1961bs of 46-0-0 @ .19cent/]b; 771bs of 0-45-0 <br />@ .18cent/Ib. Seed cost for one acre (per seed mix given in reclamation plan) <br />current cost of seed mix is $131.00 dollazs per <br />acre ......................................................................... $ 273.80 <br />b) Seed and mulching; broadcast seed and mechanically cover. Mulching and <br />crimping of l.7 acres. We will need 100-SOIb, bales of hay @ $10.00 per bale, <br />use of a 230 DBH, 4wd farm tractor with operator, broadcaster and mulcher, <br />approximately two acres per hour @ $90.00 per hour, one hour <br />required .................................................................. $1155.00. <br />3. Mobilization and demobilization: Equipment is available within a two mile radius of <br />permit site. <br />4. TOTAL ESTAMATED COST: $2.685.80 <br />r1 <br />U <br />