Laserfiche WebLink
RECLAMATION CO~ARY cont'd <br />K. PORTAL/SHAFT SEALING <br />Task No.~ Task Description <br />sheet 4 of 4 <br />Cost (5) <br />Subtotal (K): <br />L. DRILL HOLE/MONITORING WELL SEALING <br />Task No.l Task Description <br />Subtotal (L): <br />M. MISCELLANEOUS RECLAMATION TASKS <br />Task No.l Task Description <br />10a <br />11a <br />12a <br />13a <br />DemolitionD ispose of 10'x10'x20' mass a 80.23/c.f <br />Seeding As per attached worksheet <br />Fencing 5000' Of 3 wire fence a 51.60/ft <br />Mob/Demob As per attached worksheet <br />Subtotal (M )'. <br />TOTAL DIRECT RECLAMATION COSTS (subtotals A through M)'. <br />fl. INDIRECT COSTS <br />A. CONTRACTOR'S OVERHEAD & PROFIT <br />Item No.~ Item Description <br />1. ~ Public Liability Insurance.... 1.550% of dir. <br />2. ~ Contractor's Performance Bond 1.550% of dir. <br />3. ~ Contractor's Profit........... 10.00% of dir. <br />4. ~ Job Superintendent.. <br />Cost (5) <br />Cost (5) <br />8460 <br />816,360 <br />88,000 <br />81,407 <br />826,227 <br />897,951 <br />Cost (5) <br />I___________. <br />81,518 <br />81,518 <br />59,795 <br />Subtotal (A): 512,832 <br />TOTAL CONSTRUCTION CONTRACT AMOUNT (direct plus 0 8 P): 8110,783 <br />B. DMG PROJECT ADMINISTRATION EXPENSES <br />Item No.~ Item Description ~ Cost (5) <br />1. ~ Minerals Program Adm 5.00% of cntr.~ 55,539 <br />NET INDIRECT LOST PERCENTAGE: 18.76% Subtotal (B): $5,539 <br />__________ ____________ <br />TOTAL INDIRECT RECLAMATION COSTS (subtotals A through B): 818,371 <br />TOTAL PERFORMANCE BOND AMOUNT (direct plus indirect costs): 5116,322 <br />