Laserfiche WebLink
<br />RECLAMATION COS S MMARY cont'd sh~ of 4 <br />H. EARTHWORK - STREAM CHANNEL RECONSTRUCTION <br />Task No.l Task Description I Cost (S) <br />__-_--° I------------------°--------________------"----° I "----_______ <br />I I <br />I I <br />I I <br />I I <br />Subtotal (H): <br />____________ <br />I. EARTHWORK - DRAINAGE CONTROL SYSTEM INSTALLATION/REMOVAL <br />Task No.l Task Description I Cost (S> <br />Sa I Excavate trapezoidal outlet structure. I 8517 <br />I I <br />6a I Purchase 1540 c,y. of 2' diameter riprap w/local I 830,814 <br />I delivery included a 820,00/c.y. I <br />I I <br />7a I Use excavator to place riprap on outlet st ructurel 81,065 <br />I I <br />I I <br />I I <br />I I <br />I I <br />I I <br />I I <br />I I <br />I I <br />I I <br />I I <br />I I <br />Subtotal (I): 532,396 <br />J. EARTHWORK - TOPSOIL/SUBSOIL REPLACEMENT <br />Task No.l Task Description I Cost (S) <br />________I________..______________________~_________________I____________ <br />Sa I Replace an average of T' depth of topsoil on I 8479 <br />I perimeter of Phase V area. I <br />9a I Replace an average of 7~~ depth of topsoil on ~ 82,998 <br />I Phase IX area. I <br />Subtotal (J): 83,477 <br />