My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE65613
DRMS
>
Back File Migration
>
Permit File
>
700000
>
PERMFILE65613
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:11:23 PM
Creation date
11/20/2007 8:58:26 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1987171
IBM Index Class Name
Permit File
Doc Date
12/13/1994
Doc Name
REQUEST FOR REAFFIRMATION OF ORIGINAL APPROVAL FOUNTAIN COLONY PIT FN M-87-171
From
FOUNTAIN COLONY INVESTMENT CO
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-. • • Page 3 <br />upon the proposed plan for the site, either as originally proposed or as altered by the company <br />that would [nine the site. Not less than 60 days notice prior to star of operations will be given <br />the Division to provide sufficient time for calculations and formal setting of the bond. <br />2. Prior to start of operations ail additional permits and approvals, including the <br />Fugitive Dust Permit, Suttionary Source Pollution Emissions Permit, Stormwater NPDES <br />Permit, Stormwater Management Plan Certification, attd any other requirements that may be <br />set prior to when the operation would begin, would be acquired. <br />(Note: This is similar to several of the conditions already included in Ordinance No. <br />766 from the City of Fountain. Also, the sediment control facilities required by the city <br />have already been designed and approved. These would form the foundation for the <br />NPDES permit and the Stormwater management plan.) <br />3. In the event t}te actual mine operator desired to mine the site in a fashion different <br />from the original design or include various facilities that would complement his operation, such <br />changes will be submitted and must be approved prior to mining the site in a fashion different <br />from the originally designed plan. <br />4. If the Mined Land Reclamation Board reaffirms the original approval made on <br />January 21, 1988, Fountain Colony Investment shall submit a bond in the amount of $5,000 <br />within 60 days of formal notification of the approval action. It is understood that this bond <br />does not allow mining operations of any kind to occur, but is simply to hold the site and the <br />permit in reserve until an operator can be found. <br />If you desire to discuss this matter further please do not hesitate to call myself or Mr. Heiftter. <br />Let us !cno:v when. the Board wili be considering this matter and a representative of Fountain <br />Colon} as well as Mr. Heffner will attend the meeting to discuss the matter further with the <br />Board attd answer any questions the Board or the Division might have. <br />Thank you for your help in this matter and we sincerely hope the issue can be resolved to the <br />satisfac[ion of all parties involved. <br />Reply to: <br />3025 Sunnybrook Lane <br />Colorado Springs, CO 80904 <br />General Paztner <br />
The URL can be used to link to this page
Your browser does not support the video tag.