Laserfiche WebLink
<br />June 18, 1993 <br />Sarah Plocher <br />Page 2 <br />The present structures and the small area exemption sump, once <br />approved, will be maintained on a regular basis and as required to <br />prevent erosion and prevent sediment delivery to State waters. <br />Procedures will include reseeding if necessary, repairs to rills <br />and gullies, and mulch if required. <br />The supervisory personnel of Landmark are very experienced in <br />sediment and runoff control on projects of this type and are <br />annually retrained in materials handling, erosion control, and <br />spill response practices. <br />No discharge has taken place, been reported, or is expected at <br />the site. The potential for pollution by stormwater contamination <br />at this site is very minimal. <br />All records of this operation are on file at the Landmark <br />office at Littleton, Colorado. <br />Please call if you require further information or have <br />questions. <br />Sincerely, <br />G~~ <br />Mark Kerr <br />Operations Manager <br />