My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE65403
DRMS
>
Back File Migration
>
Permit File
>
700000
>
PERMFILE65403
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:11:12 PM
Creation date
11/20/2007 8:51:28 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Permit File
Doc Date
11/8/1988
Section_Exhibit Name
EXHIBIT L RECLAMATION COSTS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br />' Reclamation Cost Summary <br /> Phase 1 Reclamation Summary <br /> A. Pits $ 88,266 <br /> B. Waste Rock Disposal Areas 743,486 <br />' C. Heap Detoxification 222,840 <br /> D. Heap Grading 82,675 <br />' E. Mill Facilities <br />F <br />R <br />d 297,646 <br />5 <br />8 <br /> . <br />oa <br />s 4 <br />, <br />59 <br /> G. Seeding 68,490 <br />' H. Trees 8,334 <br /> I. Miscellaneous Costs 71.010 <br />' TOTAL RECLAMATION COSTS $1,628,606 <br /> Contingency of 25% S 407.152 <br />t TOTAL BONDING REQUIREMENTS 52,035,758 <br /> PHASE 1 BOND COSTS OF $2,052,000 AS CALCULATED BY THE MLRD ARE CLOSE TO <br /> THE PHASE 1 BOND COSTS CALCULATED BY BATTLE MOUNTAIN. A PHASE 1 BOND OF <br />' $2,052,000 WILL BE SUBMITTED. <br /> Phase 2 Reclamation Summary <br /> A. Pits 5 150,240 <br />~' B. Rock Toe Buttress 359,937 <br /> B. Waste Rock Disposal Areas 1,086,327 <br /> C. Heap Detoxification <br />D <br />H <br />G <br />di 356,4]0 <br />117 <br />575 <br /> _ <br />eap <br />ra <br />ng , <br /> E. Mill Facilities 297,646 <br />' F. Roads 45,859 <br /> G. Seeding 119,252 <br />' H. Trees 8,334 <br /> I. Miscellaneous Costs 81.820 <br />' TOTAL RECLAMATION COSTS $2,623,400 <br />Contingency of 259e $ 655.850 <br />TOTAL BONDING REQUIREMENTS $3,279,250 <br />_ PHASE 2 BOND COSTS CALCULATED BY THE MLRD ARE $3,300,300 AND A,RE CLOSE TO <br />' THE COSTS CALCULATED BY BATTLE MOUNTAIN. A BOND FOR $3,300,300 WILL BE <br />SUBMITTED. <br /> <br />1 <br />L-21 <br />(Revised 4120189) <br />(Revised 3/14/89) <br />
The URL can be used to link to this page
Your browser does not support the video tag.