~~~ ~~ <br />north. Additional topsoil will be used for reclaiming the pit into more natural looking <br />topography. <br />No explosives will be used in conjunction with the mining and reclamation operation. <br />3. Mining Timetable <br />The following timetable is a best estimate of the sequence of operations for the life of the mine <br />after October 2006 and is based on mining and selling 250,000 tons of total product per yeaz: <br />Table D-4 Reclamation Timetable <br />Task # Description Time Needed Months <br />1 Mine Phase 1. 14.28 <br />2 Reclaim Phase 1, and mine Phase 2. 15.48 <br />3 Reclaim Phase 2, and mine Phase 3. 13.3 <br />4 Reclaim Phase 3. 2.0 <br /> Total months 45.08 <br /> Total years 3.8 <br />This table is based on a reasonable projection of average production rates. <br />4. Mine Facilities and Operation <br />The site will contain the following facilities, it is noted where applicable whether or not the <br />facility is portable and whether it will have any fuel storage associated with it. Table D-5 below <br />shows a summary of the tanks which will be present onsite as well as a summary of the <br />secondary containment used with each tank. <br />• A portable screening/washingplant with a 500 gallon diesel tank <br />• A portable Asphalt plant with a 25,000 gallon diesel tank <br />• A portable Concrete plant with a 500 gallon diesel tank <br />• Portable Scales <br />• A portable office trailer <br />White River City Pit, Apri107 D-6 <br />