My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE65373
DRMS
>
Back File Migration
>
Permit File
>
700000
>
PERMFILE65373
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:11:11 PM
Creation date
11/20/2007 8:50:21 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2006084
IBM Index Class Name
Permit File
Doc Date
5/1/2007
Doc Name
PAR Response
From
Greg Lewicki And Associates
To
DRMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />The anticipated future average total tonnage sold from the site in any one calendar year is <br />250,000 tons. Table D-1 below shows a breakdown of the expected average annual production. <br />Table D-1 <br />Average Annual Product Distribution <br />Product Tons Sold % Reject Rate <br />aturals Tons Mined <br />Road Base 140,000 0% 140,000 <br />Concrete 30,000 10% 33,333 <br />As halt 30,000 40% 50,000 <br />Pit Run 20,000 0% 20,000 <br />Washed A e ate 30,000 10% 33,333 <br />Total 250,000 7% 269,397 <br />The total permit azea is 92.74 acres. A breakdown of the estimated azeas is included in Table D- <br />2. <br />Water from the mining operation will not be dischazged from the site except through the <br />sediment pond in the northeast corner of the permit. In order to ensure that water from inside the <br />operation does not leave the site, several isolation berms will be created around the pit, as seen <br />on Map C-2. Surface water and runoff is more fully discussed in Exhibit G: Water <br />Information. <br />Table D-2 Permit Acreage Breakdown <br />Permit Area Description Acreage <br />1. Undisturbed Land 49.95 <br />2. Access Roads 0.39 <br />3. Phase 1 10.96 <br />4. Phase 2 10.94 <br />5. Phase 3 10.84 <br />6. Staging Area 9.66 <br />Total Permit Area 92.74 <br />In order to access the phases throughout the mining of the pit, several internal haulage roads will <br />have to be constructed. Each road is labeled on Map C-2 indicating which Phases they will be <br />White River City Pit, April 07 D-4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.