Laserfiche WebLink
~ ~ <br />• <br />~t'~~i37yI~~~1:1 <br />,~;1,,,,, '; <br />~~'I L"Control of Materiels Handling <br />® A.'~ Loadout to grizzly, stockpile, or for final transport (desc <br />loadout) IlOPPER C11lfI'[i IMIC) TRIi(}I ma rrnrnr T11,MISPb1~l-P- <br />~1. Full enclosure (descrSbc) ! <br />~2, Partial enclosure (describe) <br />~3, Chemical stabilizers (describe) <br />* ® 4, lJa[er spray (describe method b rate of application SP <br />FFOP1 WATF'R irr.rr' a d 5 rnr.r nnrc aro nernrt m.r <br />• <br />• <br />~S, Negntive pressure w(th fabric filter <br />~6, Stacker-Ireigl~t adjustable <br />~7, Telescoping chute <br />~8, No control <br />List all other loadouts, describe method and control methodology <br />5, Partially enclosed, f <br />* ©6, Open with taster spray or chemical stabilizers (circle one)' <br />7, No control ~~ <br />I <br />i <br />list all other conveyors and transfer points Sf control methodolol;v checked <br />above does not apply to all operations Np ryT'FIF~~iNVI'YnR r1R TRANC~p <br />® B, Conveying and transfer points <br />~1, Totally enclosed with negative pressure to a bagfllter. <br />~2,. ~ Totally enclosed with water spray or chemical stabilizers' <br />(circle one) <br />i <br />~3, Totally enclosed, <br />4, Partially enclosed with water spray or chemical stabilizers <br />(circle one) <br />el I <br />Page 3 <br />' ,~, i <br />-~1 <br />,.~ <br />°,4 <br />i <br />.~ <br />