Laserfiche WebLink
~f <br /> <br />• <br />• <br /> ,!CBI <br />, . <br /> " <br />~C, Compacting of piles '~`~~. ~ <br /> ;. i. <br />~ <br />3fi, <br />~~~ <br /> Method ~ ;~ <br />d <br /> To what apecificatlonl t . <br />I'I I' <br /> <br />® D. <br />Enclosures (describe if complete or partial, type of materiel, et ~ <br />) ~,1 <br />I: <br />' <br /> ' • <br />.r <br /> IRON HOPPER AND BINS S '~~ <br /> <br />E. I <br />Covers (describe) <br />•~ F. Re vegetate by seeding with or without mulch (circle npproprinte <br /> items). Types of vegetation IIJCAL CRnSS CC7hs~u1NTTTRS ~ <br />G. Wind breaks <br /> 1. Type <br /> ~a. Solid: Material (i.e., brick, cement, wood) <br /> b. Mesh wind screens (state mesh size) <br /> c. Snow fence or other fence (specify) ~ <br /> d. Rerms (describe) <br /> p c. Vegetation (describe type b spacing of trees or <br /> shrubs) <br /> f. Other (describe) <br /> 2, Description: if claiming wind breaks ns a control methodology <br /> you must specify height, length and location of piles and wind <br /> breaks and provide a map indica[Sng location of piles, wind <br /> breaks, and prevailing winds. <br />~li, Other strategics (describe such as pile alignment, upwind facing <br /> slope, loadout on downwind side, minimize traffic on and around pile, <br /> etc.) <br /> <br />~I, No Control <br />List all other stockpiles and/or disposal areas and describe location, type of <br />material, size and control methodology ~ O'I'I1ER STCX'KPTiA,$y [1a nTSprtcj~, <br />Page 2 <br />